The next step toward a dry house, is the exterior finish. Which will mostly be stucco for this house.  This will match the garage in it's style and color.

Check out the prep work. They tell me there is two layers of Felt paper and then the wire mesh. The first coat goes down on Monday.








Check this picture out. It's showing the front door, late in the afternoon. Notice anything?  How about the light?  That is natural light from those windows that are way up high. Oh, they are also on the opposite side of the house from the front door. So they are doing their job at bringing in natural light to the "core" of the house.
Notice: There would be more light, except the temp railing on the catwalk (2x8) is blocking a bunch of it.  Just wait until there is painted drywall on those walls. The light will be bouncing all over the place.